Republic Deck Progress

AustinParksFoundationSpecial Projects, Parks Leave a Comment

Our contractors have had two days without rain this week (Wed and Thu) allowing us to make good progress on laying down the IPE wood deck.  It’s heavy, dense material, all holes are pre-drilled, 3 inch long screws and all boards must be 1/4 inch apart to maintain ADA (Americans With Disability) access.  A slow process, but it is looking …

Invasives Removal at West Bouldin Creek Greenbelt

AustinParksFoundationParks, Volunteer Leave a Comment

On Saturday, 12/5, the Bouldin Creek Neighborhood Parks committee began the first in services of invasive (non-native) tree and plant removal from the West Bouldin Creek Greenbelt.  This is one of a series of recommendations from a recently completed LBJ Wildflower Center Study for improving and restoring the greenbelt.  Here’s a photo along S. 6th of the big pile of …

Wooldridge Square – Giving Big Trees a Big Boost

AustinParksFoundationSpecial Projects, Parks Leave a Comment

Last week, Bartlett Tree Experts began work to prune one tree and perform their Root RX on ten additional trees at this square which just celebrated its 100 anniversary as a park in June. [fusion_builder_container hundred_percent=”yes” overflow=”visible”][fusion_builder_row][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” border_style=”solid” spacing=”yes” background_image=”” background_repeat=”no-repeat” padding=”” margin_top=”0px” margin_bottom=”0px” class=”” id=”” animation_type=”” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”no” center_content=”no” min_height=”none”] Root Rx …

More Trees for Pease

AustinParksFoundationParks, Volunteer Leave a Comment

Over 100 more trees (complete with in ground irrigation) were installed by volunteers today at Pease Park.  Thanks to Richard Craig and Trees for Pease, as well as the City of Austin Parks Forestry Division, TreeFolks and our many volunteers.  We have another 40 or so trees to be planted sometime in the next month or two that we could …

Steel and Stone at Republic

AustinParksFoundationSpecial Projects, Parks Leave a Comment

  [fusion_builder_container hundred_percent=”yes” overflow=”visible”][fusion_builder_row][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” border_style=”solid” spacing=”yes” background_image=”” background_repeat=”no-repeat” padding=”” margin_top=”0px” margin_bottom=”0px” class=”” id=”” animation_type=”” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”no” center_content=”no” min_height=”none”] We’re making great strides with the most of the stone cladding now in place on the outside of the deck structure, most of the major steel beams set in place in the interior, with interior …

Republic: Stone Panels

AustinParksFoundationSpecial Projects, Parks Leave a Comment

The limestone panels (several inches thick) are going into place around the exterior of the deck at the Auction Oaks site at Republic Square.  Picture from yesterday afternoon:   [fusion_builder_container hundred_percent=”yes” overflow=”visible”][fusion_builder_row][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” border_style=”solid” spacing=”yes” background_image=”” background_repeat=”no-repeat” padding=”” margin_top=”0px” margin_bottom=”0px” class=”” id=”” animation_type=”” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”no” center_content=”no” min_height=”none”] [/fusion_builder_column][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” …