Recycling Stone Bollards At Pease Park

AustinParksFoundationParks, Special Projects Leave a Comment

With the completion of Phase 1b of the Auction Oaks Project @ Republic Square, we have a number of surplus stone bollards that used to ring the Auction Oaks area.  Thanks to help from the Parks Dept, specifically the folks in forestry, we removed a portion of a parking lot immediately around a big old oak tree, put down mulch, …

Republic Square Tree Grate coming soon

AustinParksFoundationParks, Special Projects Leave a Comment

Ironsmith has completed fabrication of our nine foot wide three piece tree grate, one of the last remaining pieces of our Auction Oaks @ Republic Square Phase 1 project.  This will replace the temporary plywood plug that is in the middle of the deck now.  It will be shipped soon from the fabricator in Southern California and should be installed …

Republic Square Deck is Open!

AustinParksFoundationParks, Special Projects Leave a Comment

We’re pleased to announce that the Republic Square Auction Oaks Phase 1b project is substantially complete and we’ve removed the construction fence.  Still left to do are some touch-up work, installation of the metal tree grate (coming in mid-February) and allowing the sod to root in.  We will be putting out tables and chairs soon and the Farmer’s Market is …

Invasive Trees and Plants Fall at West Bouldin Creek

AustinParksFoundationParks, Volunteer Leave a Comment

[fusion_builder_container hundred_percent=”yes” overflow=”visible”][fusion_builder_row][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” border_style=”solid” spacing=”yes” background_image=”” background_repeat=”no-repeat” padding=”” margin_top=”0px” margin_bottom=”0px” class=”” id=”” animation_type=”” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”no” center_content=”no” min_height=”none”] Thanks to the Bouldin Neighborhood Parks Committee for hosting their second monthly volunteer workday.  We continued to pull out or cut down Invasive species in the greenbelt as part of City approved restoration plan.  We focused …

Volunteer Workday at West Bouldin this Sat (1/23)

AustinParksFoundationParks, Volunteer Leave a Comment

The West Bouldin Creek Greenbelt workday has been rescheduled from last Saturday (1/16) to this Saturday (1/23) from 8:30 to 1 pm.  We’ll meet at the South 6th Street entrance to the greenbelt. – Link to park page and map: https://austinparks.org/apfweb/park.php?parkId=374 We’ll be bring some tools, but if you have handsaws, shovels or rakes, please bring those. We also recommend …

1/19 – 6-8 pm – Auditorium Shores Stakeholder Meeting

AustinParksFoundationParks, APF News Leave a Comment

[fusion_builder_container hundred_percent=”yes” overflow=”visible”][fusion_builder_row][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” border_style=”solid” spacing=”yes” background_image=”” background_repeat=”no-repeat” padding=”” margin_top=”0px” margin_bottom=”0px” class=”” id=”” animation_type=”” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”no” center_content=”no” min_height=”none”] Tonight – Tue, 1/19: Audtiorium Shores/Butler Park Stakeholder Meeting 6-8 pm 1/19 @ Town Lake Center, 721 Barton Springs Road. View and give comments on revised designs for improvements. [/fusion_builder_column][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” …