The Austin Parks and Recreation Dept’s Construction Crew is working on a new trail head and access point for the Shoal Creek Trail at Pease Park on Kingsbury St.. On Friday they constructed a ramp to provide easy accessible access to the trail from Kingsbury St. and also allow deliveries of mulch, trees and dillo dirt that the Trees for Pease folks ask for all of the time. This replaces the old “route” which went up the middle of the park and is now populated with newly planted trees and in ground irrigation.
[/fusion_builder_column][fusion_builder_column type=”1_1″ background_position=”left top” background_color=”” border_size=”” border_color=”” border_style=”solid” spacing=”yes” background_image=”” background_repeat=”no-repeat” padding=”” margin_top=”0px” margin_bottom=”0px” class=”” id=”” animation_type=”” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”no” center_content=”no” min_height=”none”]Our thanks to James Young and his construction crew as well as Tony Arnold and Marty Stump of the Parks Department’s planning, construction and design team. The crew has another day or so of work, packing down the granite gravel, refinishing the edge of the ramp and along the trail and installing another small section of trail deeper in the park to allow vehicles to turn around.[/fusion_builder_column][/fusion_builder_row][/fusion_builder_container]